paper mill

Data realizacji: 
VI 2016 – VII 2016
Schongau Germany

DISMANTLING
 Primary air system: Blower + motor, air preheaters, channels, injections
 Secondary air system: Blower + motor, silencer, channels, injections, bent tubes
 Recirculation air system: Blower + motor, channels, injections
 Ash system: Conveyor, channels, sieving machine, ash feeder gate
 Burner: Burner with accessories, blowers, bent tubes
 Fuel chute system: fuel chute + conveyors incl. cover, flange, bent tubes
 Measuring: existing measuring instruments
 Superheater 1 incl. outlet header
 Superheater 2 incl. outlet header

ERECTION
Primary air system: Blower + motor, air preheater, channels, injections
Secondary air system: Blower + motor, silencer, air preheater, channels, dampers, injections, bent tubes
 Recirculation air system: Blower + motor, channels, dampers, injections
 Ash system: Conveyor, channels, sieving machine, ash feeder gate
  Burner: Burner with accessories, blowers, bent tubes

  Fuel chute system: fuel chute + fuel transportation conveyor
 SNCR: Tank, pumps, piping, bent tubes, injections
 Natural gas: adaption gas station and piping
 lnstrument air system
 Measuring: replacement of existing instruments and new instruments
 Superheater 1 incl. outlet header
 Superheater 2 incl. outlet header

Scope of works included complex NDT works.